Royale High Wiki
Removed content
This article is about something that has been entirely removed from Royale High.
This article is incorrect, outdated, or otherwise needs improvement.
Help fix the page by editing it.
The specific problems are: Add information about locations and add PNG files for stuff from the Royalloween event

Campus 4 Alpha is a testing realm released on August 15, 2024, that players level 200 or higher have access to. Players can explore a work in progress state of Campus 4, a new campus with elements of the previous three campuses combined.

On October 13, 2024, Campus 4 Alpha was made available to all players for the Royalloween 2024 event, as well as extending the day/night cycle to approximately 45 minutes.

On November 2, 2024, Campus 4 Alpha was updated to cover the campus in snow and the Fountain covered in ice.

On December 7, 2024, Campus 4 Alpha was updated with more holiday and festive decor, along with a bus teleporter to Snowboard Mountain.

On April 16, 2025, Campus 4 Alpha was removed from the game map and players spawned in Campus 4.

Descriptions[]

August 15, 2024[]

From August 15, 2024 to October 13, 2024, the Campus 4 Alpha teleportation description originally was the following: "Take a peak behind the curtain and watch Campus 4 come to life as we develop this southern California-based school! Levels 200+ only while in development!"

October 13, 2024[]

From October 13, 2024 to December 7, 2024, the Campus 4 Alpha teleportation description stated the following: "Come enjoy the fresh autumn air at our newest breezy outdoor campus, where the Falling Leaves Festival is taking place!"

December 7, 2024[]

Starting on December 7, 2024, the Campus 4 Alpha teleportation description stated the following: "Come enjoy the fresh snowy air at our newest breezy outdoor campus, where you can decorate your dorm for the holidays!"

Locations[]

Wheel[]

Fountain Plaza[]

School Office[]

Classrooms[]

On December 7, 2024, players can enter the Art or Rainy Day Classrooms by interacting with the door. Additionally, the three classrooms on the second floor were decorated to have a computer room, a dance studio, and detention.

Dormitories[]

Bathing Quarters[]

This area was removed on October 13, 2024.

Football Field[]

Cafeteria[]

During the launch of Campus 4 Alpha, the Cafeteria is a large grey cube located to the right near the back of the School Office. It was later removed on October 13, 2024.

Library[]

During the launch of Campus 4 Alpha, the Library was an incomplete building near the back of the School Office towards the left. It was later removed on October 13, 2024. Then on November 2, 2024, the exterior was added though players could not enter inside.

Basketball Courts[]

Cotton Candy Student Store[]

During the launch of Campus 4 Alpha, the Cotton Candy Student Store was a one story building. It was later removed on October 13, 2024.

Later on December 7, 2024, the store returned next to the basketball courts and the School Office.

Graveyard[]

Located in the mountains by the Falling Leaves Festival Grounds is a graveyard. Various gravestones with the text "Here lies callmehboo" could be found along with a mausoleum containing two Darkest Dreams Vampire Coffin Beds.

Falling Leaves Festival Grounds[]

On August 15, 2024, the Falling Leaves Festival Grounds could be found in the works near some mountains.

Gallery[]

Initial Release[]

Royalloween 2024[]

Glitterfrost 2024[]